Jump to content

[Shinhou - Constructing a Monster


Elrich von Richt

Recommended Posts

  • Replies 105
  • Created
  • Last Reply

Top Posters In This Topic

OOC: Building location is in Northern Sakhalin, about 200 miles outside the capital of Haruhigrad, which is RL Yuzho-Sakhalinsk.

IC: The drydock is currently finishing it's final stages.

OOC: 4 months have passed since construction began.

IC: Construction is proceeding on schedule at the location indicated in the map below, and while it is possible to start construction of the vessel (ship? barge?) now, it would be more efficient and cost-effective to wait another month until more of the dock's systems are online.

Screenshot2009-09-26at34011PM.png

Edited by iKrolm
Link to comment
Share on other sites

Dr. Kettenheim has finished his design.

HX-2ApocalypseCannon-3.png

To be armed with:

1050mm Main Gun

HX-2ApocalypseCannon1050mmgun.png

x2 450mm Turrets

HX-2ApocalypseCannonDuel450mm.png

x4 150mm Quad-Turrets

HX-2ApocalypseCannonQuad150mm.png

x25 40mm Tri-AA turrets

Tri-40mmAATurret-1.png

x5 110mm 32-missile AA turret

HX-2ApocalypseCannonMissileTurret11.png

x4 700mm 32-missile AA turret

HX-2ApocalypseCannon700mmAA.png

Construction should begin on these weapons, so they can be easily installed onto the superstructure when it is finished.

Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...