Jump to content

dralf

Members
  • Posts

    17
  • Joined

  • Last visited

Posts posted by dralf

  1. without infra Purchase modifier (resources, gov type, factories)

    assuming buy in batches of 10 infra at a time,

    0 to 100 infra should be $102,800.00

    Infra upkeep cost per unit $25.00

    Total Infra upkeep cost $2,500.00

    10 tech = $100k

    from 0 to 200 infra should be $370,300.00

    Infra upkeep cost per unit $32.00

    Total Infra upkeep cost $6,400.00

    20 tech = $100k+$150k = $250k

    infra upkeep is calculated w/o taking into account the tech discount.

    not sure whether is correct. if wrong don't blame me :P

×
×
  • Create New...