Jump to content

Infra Cost Equations


Vinas Solamnus

Recommended Posts

Are these right?

Infrastructure Purchase Cost:

0-19.99 = 500

20-99.99 = 12 X Infra Level + 500

100-199.99 = 15 X Infra Level + 500

200-999.99 = 20 X Infra Level + 500

1000-2999.99 = 25 X Infra Level + 500

3000-3999.99 = 30 X Infra Level + 500

4000-4999.99 = 40 X Infra Level + 500

5000-7999.99 = 60 X Infra Level + 500

8000-?= 70 X Infra Level + 500

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...