HHAYD Posted February 9, 2009 Author Report Share Posted February 9, 2009 The list have been edited by the government. Priority and completion project list: 1. Upgrade the current recycling centers and build new recycling centers. 60% completed 2. Repair the current railroads 50% completed 3. Repair the current highways 5% completed 4. Build new geothermal power plants. 5. Build new railroads. 6. Build new highways. 7. Repair the current roads and build new roads. 8. Construct the reinforced utility tubes and the natural sewage treatment plants. 9. Build the new subway systems and elevated rails. 10. Build new canal locks. 11. Upgrade the older canal locks. Bolded-in progress Crossed out-completed All current recycling centers have been finished being upgraded. The new recycling centers are still under construction, but some of them are nearly completed. Quote Link to comment Share on other sites More sharing options...
ottawa1234 Posted February 10, 2009 Report Share Posted February 10, 2009 Gorge Sir was the leader of the survey crew. They were going to build a highway across a flat area, connecting two other highways together. Gorge Sir told another surveyor, "Lets see, we can flatten that hill up head to make way for the..", but only to get cut off when the hill suddenly exploded. Imminently, a cloud of boiling steam came out the the blown up hill that is now a crater."What the..." remarked a surveyor. "Call the geologists, imminently. I think there is a boiling water source under than crater" replied Gorge Sir. ----------------------------------------------------- News report: A recent explosion occurred on the planned to be built highway route 45. The explosion was caused by a build up of boiling steam. Geologists concluded that there is a hot spot under the crater that is still spilling out steam. Plus, nine more geological hot spots were discovered by the construction or repair crews. The GLS government is planning on adding geothermal power plants construction to the massive infrastructure upgrade bill. IC: As Bohovia has over 12,000 workers helping construct, we are very conserned about there safety, we ask that the GLS officials, check for these hazards before sending Bohovian workers to these construction areas, we do not want any Bohovian workers getting hurt. We thank you for your coaporation. Quote Link to comment Share on other sites More sharing options...
HHAYD Posted February 10, 2009 Author Report Share Posted February 10, 2009 (edited) IC: As Bohovia has over 12,000 workers helping construct, we are very conserned about there safety, we ask that the GLS officials, check for these hazards before sending Bohovian workers to these construction areas, we do not want any Bohovian workers getting hurt. We thank you for your coaporation. No one was hurt of killed. However, now, we have decided to have teams of geologists that are suppose to examine the area before surveying, during surveying, and during construction. Edited February 10, 2009 by HHAYD Quote Link to comment Share on other sites More sharing options...
ottawa1234 Posted February 10, 2009 Report Share Posted February 10, 2009 No one was hurt of killed. However, now, we have decided to have teams of geologists that are suppose to examine the area before surveying, during surveying, and during construction. This is good to hear, Bohovia thanks you for your effort to keep our workers safe. Quote Link to comment Share on other sites More sharing options...
HHAYD Posted February 12, 2009 Author Report Share Posted February 12, 2009 The list have been edited by the government. Priority and completion project list: 1. Upgrade the current recycling centers and build new recycling centers. 100% completed 2. Repair the current railroads. 100% completed 3. Repair the current highways 65% completed 4. Build new geothermal power plants. 5. Build new railroads. 6. Build new highways. 7. Repair the current roads and build new roads. 8. Construct the reinforced utility tubes and the natural sewage treatment plants. 9. Build the new subway systems and elevated rails. 10. Build new canal locks. 11. Upgrade the older canal locks. Bolded-in progress Crossed out-completed The project have been delayed by a report of Great Lakes State International Airport that have been put under a full scale quarantine due to deadly flu viruses. All foreign workers and GLS citizens are to be evacuated, but they have to be put in quarantine centers for 72 hours in case if any of them are infected with the flu virus. Quote Link to comment Share on other sites More sharing options...
HHAYD Posted February 14, 2009 Author Report Share Posted February 14, 2009 The GLS government is now reediting the act since other nations are attempting to destroy the flu viruses by burning everything that is suspected to be contaminated using napalm and flame throwers. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.