HHAYD Posted August 20, 2011 Report Share Posted August 20, 2011 (edited) Classified: [quote]To: TriOptimum From: Department of Defense, Midwest Republic We need a 500 megawatt thorium powerplant for our St. Lawrence Gulf Naval Air Base.[/quote] Edited August 20, 2011 by HHAYD Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 20, 2011 Report Share Posted August 20, 2011 [code]To: Department of Defense, Midwest Republic From: TriOptimum Body: We will gladly construct such a power plant for you. Just point us to the site where you want it and we'l get to work. The approximate price is attached to this message. Att.: Invoice[/code] Quote Link to comment Share on other sites More sharing options...
HHAYD Posted August 20, 2011 Author Report Share Posted August 20, 2011 (edited) [quote]To: TriOptimum From: Department of Defense, Midwest Republic After analyzing the projected power consumption of the base, we'll need a 450 megawatt power plant. The power plant is to be built 300 meters underground, we have already excavated the soil and rocks and built a supporting shell. We have also built tunnels to connect the power plant to the rest of the base. We will send you a map of the exact location within a few hours. If you wish to accept the contract, you may not leak any information about the power plant or base and you will destroy all information about the project once it's fully completed. I hope you understand the consequences of failing to keep the project confidential.[/quote] Edited August 20, 2011 by HHAYD Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 20, 2011 Report Share Posted August 20, 2011 (edited) [code]To: Department of Defense, Midwest Republic From: TriOptimum Body: Quite a depth. Regardless, we can build the plant there, if proper cooling and other needed infrastructure can be constructed there. We will naturally take all necessary measures to keep the project secret and confidential.[/code] Edited August 20, 2011 by Lynneth Quote Link to comment Share on other sites More sharing options...
HHAYD Posted August 20, 2011 Author Report Share Posted August 20, 2011 [quote]To: TriOptimum From: Department of Defense, Midwest Republic We can build the necessary supporting infrastructure, all we need are the details. Cooling shouldn't be a problem as the St. Lawrence Gulf's cold deep water is not very far away from the planned location of the power plant.[/quote] Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 20, 2011 Report Share Posted August 20, 2011 [code]To: Department of Defense, Midwest Republic From: TriOptimum Body: Standard infrastructure for a nuclear power plant. Details are in the attachment. Everything adheres to Ceylon standards as dictated by the corporate government. High safety overall, yet retaining good flexibility in case more than the base needs to be supplied with power. Att.:Required Infrastructure, plans and details[/code] Quote Link to comment Share on other sites More sharing options...
HHAYD Posted August 20, 2011 Author Report Share Posted August 20, 2011 [quote]To: TriOptimum From: Department of Defense, Midwest Republic What would be the estimated price-tag for the power plant?[/quote] Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 20, 2011 Report Share Posted August 20, 2011 To: Department of Defense, Midwest Republic From: TriOptimum Body: Roughly 1,914 Dollars per kWatt. The price for the plant itself will thus be around 861,300,000 dollars, not including whatever supporting infrastructure needs to be built. Quote Link to comment Share on other sites More sharing options...
HHAYD Posted August 20, 2011 Author Report Share Posted August 20, 2011 (edited) [quote]To: TriOptimum From: Department of Defense, Midwest Republic Another change of plans, we only need 320 megawatt. Do keep in mind that we have another other company competing for the contract.[/quote] Edited August 20, 2011 by HHAYD Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 20, 2011 Report Share Posted August 20, 2011 (edited) [code]To: Department of Defense, Midwest Republic From: TriOptimum Body: Be aware that 1,914 Dollars per kWatt is one of the best offers you can possibly find for the quality we offer. TriOptimum prides itself in reliable power generation, with stricter safety standards than any competitor. 320 MWatt would be 612,480,000 dollars. Regards[/code] Edited August 20, 2011 by Lynneth Quote Link to comment Share on other sites More sharing options...
HHAYD Posted August 21, 2011 Author Report Share Posted August 21, 2011 [quote]To: TriOptimum From: Department of Defense, Midwest Republic Please prepare a detailed plan of the power plant for us within six months.[/quote] Quote Link to comment Share on other sites More sharing options...
Lynneth Posted August 21, 2011 Report Share Posted August 21, 2011 [code]To: Department of Defense, Midwest Republic From: TriOptimum Body: The plan will be ready by then. Regards[/code] Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.