Vaule National Infrastructure Projects


Recommended Posts

[IMG]http://i328.photobucket.com/albums/l358/ImperatorAzenquor/VNIDC.png[/IMG]
[i]
"The government of the Serene Republic of Vaule,in conjunction with the East Asia Company, and various private corporations, is pleased to announce the formation of the Vaule National Infrastructure Development Company (VIDC). This new company shall spearhead our government's plans to undertake major development projects across the country. The company shall undertake several of these projects itself, but is authorized to sub-contract some projects to other companies, including those outside of the country. Ladies and gentlemen, I am pleased to introduce the CEO of VIDC, Antonin Voronin."[/i]-Deputy PM Kerbev

[b]*An ordinary looking man in a business suit steps up to the podium*[/b]

[i]"Thank you Deputy Prime Minister. VIDC is built on a simple principle: infrastructure is the backbone of the nation. Vaule's infrastructure development has not kept pace with its rapid advancement in the economic and other sectors. It is our primary mission to spearhead the drive to modernize the infrastructure of this country.

As the great General Zhukov once said: [b]'Let us build our nation. Brick by brick we rise from the ashes, renewed, strengthened and more determined'[/b]."[/i]-CEO Voronin

===
[quote]
[b]Quick facts:[/b]
[b]Name:[/b] Vaulian National Infrastructure Development Company (VIDC)
[b]Status:[/b] Private Company/Imperial Backing
[b]CEO:[/b] Antonin Voronin (official), Princess Yulia Zenn (*Classified*)
[b]Funding:[/b] B$340 billion (Official), B$96 billion (*Classified*)
[/quote]
===

[quote]
[b][u]Vaule National Development Projects[/u][/b]


[list]
[*][b]Project #1: New Residence Construction[/b]
[/list]

[b]Timeline:[/b] 1 year 3 months
[b]Aim:[/b] Apartment block construction

[b]Project Specifics:[/b]
-Construction of 10 Standard Apartment Blocks (2500 m2, 15 floor blocks)
-Construction of support facilities for Apartment Blocks
-Installation of wiretap and surveillance equipment in each apartment (*Classified*)

[b]Cost:[/b] B$70 million (per block), B$700 million (total)


[list]
[*][b]Project #2: Internet service upgrade[/b]
[/list]

[b]Timeline:[/b] 6 months
[b]Aim:[/b] To upgrade the internet services available to Esternaya residents in East Ingushetia

[b]Project Specifics:[/b]
-Laying of new fiber optic cables for internet access
-Creating High Speed Internet support infrastructure
-Upgrading phone lines where necessary
-Installation of wiretap and surveillance equipment where appropriate (*Classified*)

[b]Cost:[/b] B$97 million (from VIDC), B$5 million (from Telecom Vaulia)


[list]
[*][b]Project #3: School Infrastructure Construction/Development[/b]
[/list]

[b]Timeline:[/b] 1 year 8 months
[b]Aim:[/b] To repair and upgrade all educational institutions in East Ingushetia to the government’s minimum standard and to construct additional institutions where needed
[b]
Project Specifics:[/b]
-Undertaking a detailed structural and logistical analysis of all schools currently in East Ingushetia
-Where necessary, upgrading the infrastructure of the institutions which fall short of the government minimum standard.
-Constructing 7 new educational institutions in the East Ingushetia region
-Equipping the new educational institutions

[b]Cost:[/b] B$1.2 billion (from VIDC), B$210 million (Education Budget)


[list]
[*][b]Project #4: High Speed Rail System[/b]
[/list]

[b]Timeline:[/b] 2 years 8 months
[b]Aim:[/b] To construct a High Speed Rail Network separate from the existing Sygh-Varthys Metro System.
[b]
Project Specifics:[/b]
-Construction of 2 High Speed Rail lines from the Novaya Zemlya Autonomous Community to the Baikal Autonomous Community.
-Construction of 2 High Speed Rail lines from the Baikal Autonomous Community to the East Ingushetia Autonomous Region
-Construction of ‘Trans Siberian’ High Speed Rail line
-Construction of High Speed Rail support facilities

Cost: B$195 billion (from VIDC), B$480 million (Infrastructure Budget)


[list]
[*][b]Project #5: Airport Construction[/b]
[/list]

[b]Timeline:[/b] 1 year 11 months
[b]Aim:[/b] To Construct an International Airport & Transit hub for the east of the country.

[b]Project Specifics:[/b]
-Construction of an International Airport in the Yuktobania Autonomous Community

Cost: B$16.2 billion (from VIDC), B$2 billion (Expenses budget)


[list]
[*][b]Project #6: Imperial Palace Renovation[/b]
[/list]

[b]Timeline:[/b] 9 months
[b]Aim:[/b] To renovate the Historical Imperial Palace Compound in Sygh-Varthys

[b]Project Specifics:[/b]
-Renovating 1st floor of Imperial Palace
-Renovating the Imperial Archive and Library
-Repairing structural damage to 4th floor, north wing
-Updating military command and control facilities (*Classified*)
-Upgrading bunker and tunnel network (*Classified*)
-Security upgrades (*Classified*)

[b]Cost:[/b] B$461 million (from VIDC), B$92 million (Imperial Funds)


[list]
[*][b]Project #7: Antarctica Prison Facility[/b]
[/list]

[b]Timeline:[/b] 2 years 8 months
[b]Aim:[/b] To build a prison facility in the Vaulian Antarctic Territory

[b]Project Specifics:[/b]
-Secure facility capable of holding 35,000 prisoners
-Secure quarters for staff
-Appropriate security and defense measures
-Structures capable of withstanding the harsh conditions

[/quote]
===

[i]"The VIDC has announced its desire to sub-contract Projects 1,2,3,4 and 7 to interested non-Vaulian firms. Any company interested in obtaining one of the three available contracts is asked to contact the VIDC"[/i]

Edited by Imperator Azenquor
Link to comment
Share on other sites

KORAIL would like to bid for Project #4 (High Speed Rail System). Our KTX has a proven record as one of, if not the most, reliable high-speed railway systems in the world. We shall be able to complete the entire network at at very low cost of $150 billion, with KORAIL making up for any overcosts.

.

Edited by Kankou
Link to comment
Share on other sites

Obluchye Heavy Engineering would also like to bid for the rail projects. We have recent experience, as we have just installed the national rail system all over Marscurian Siberia. We also believe that we are the superior choice over KORAIL for two reasons.

1. The location of East Inguishia on the border of Marscurian Siberia will offer a steady supply of materials and labor, as opposed to KORAIL, which would need to move through several nations and hundreds more miles to reach the work site. This will also allow us to offer much lower prices.
2. Marscurian Siberia and Vaule share a common rail gauge (Russian Wide Gauge), as opposed to Korea, which uses the standard gauge of the InterAsian Rail Network. This means that Obluchye Heavy Engineering can use its existing machinery to work on the project. Because of this, we can begin work faster, and we can offer lower prices.

Link to comment
Share on other sites

Greater Korea has a greater population than Marscurian Siberia, and combined with the modern infrastructure of Zargathia, can easily move labor and material at very lower costs and high efficiency. In addition, the technology of Obluchye Heavy Engineering is far behind that of KORAIL, meaning it is highly doubtful that Obluchye Heavy Engineering would be able to manufacture the necessary high speed trains for the project. Also, KORAIL has already developed trains suitable for the Russian Wide Gauge, since we had been working toward exporting our trains to Mongolia, which also uses the Russian Wide Gauge. In conclusion, KORAIL is a more suitable candidate for the majority of the project.

Link to comment
Share on other sites

Cochin Chamber of Commerce submits the following bids on behalf of various Cochin corporations.

Project #1: New Residence Construction : TP Balagopalan Associates

An experience real estate developer with a long and established history of executing domestic and international projects in a time bound and cost effective manner, TP Balagopalan Associates bids for this contract. Amongst our more prestigious works are the Marscurian Pakistan University of Science and Technology in the erstwhile Marscurian Pakistan.

Project #2: Internet service upgrade

Tratum Infosystems wishes to bid for this contract. As one of the most advanced IT companies in the world and builder and maintainer of Tier I, Tier II and Tier III ISP networks we are especially capable of executing this project.

Project #3: School Infrastructure Construction/Development

CP Nair Associates bids for this contract.

Project #4: High Speed Rail System

Larsen and Toubro bids for this project. As one of the world's largest and more technologically capable infrastructure development companies we are well placed to execute this work. Our history of technologically innovative solutions speak for themselves like the Trans Himalayan Railroad, Cochin Sri Lanka Rail Road bridge project and others. Our technological and organizational capabilities, our excellent engineer and consultant staff along with our proven expertise in working in harsh terrains like Novoya Zemlya, Baikal and Siberia mean that we are the best in the business to execute this project.


Project #7: Antarctica Prison Facility

Choice Builders, a renowned real estate developer and niche resort builder wishes to bid for this project. With our proven expertise in creating state of the art facilities to maximize comforts of our clientele at various resorts all around the world, we wish to apply our expertise in this unique project where we would seek to channel our expertise in maximizing security and minimizing comfort in design for the building of this prison.

Edited by king of cochin
Link to comment
Share on other sites

Project #2 : Internet Service Upgrade

Monaco Telecom wishes to bid for this contract. Monaco Telecom is the largest internet service provider in Monaco-Valencia and one of the most technologically advanced companies in the world to build and maintain the facilities required.

Project #3: School Infrastructure Development

Monaco Education Board bids for this contract. Monaco Education Board has built and maintained over 3,000 schools in Monaco-Valencia with world class facilities. With such prior expertise and complete backing by the Prince of Monaco the Board believes they can complete this project to Vaulian education standards.


Link to comment
Share on other sites

[i]“We are pleased to announce the award of the development contracts as follows:

Project #1: TP Balagopalan Associates

Project #2: Monaco Telecom

Project #3: CP Nair Associates

Project #4: KORAIL

Project #7: Choice Builders

As with the standard sub-contracting procedures, all organization awardees are asked to submit work and entry visa applications to the nearest Vaulian Embassy. Further information about the individual projects will be made available to each organization by the VIDC. The initial payments will be transferred in the next 24 to 48 hours.

Congratulations to the contract awardees.”[/i]-CEO


[quote][b]To: KORAIL
Fr: VIDC
Re: High Speed Rail Project[/b]

Under the terms of the High Speed Rail contract, we will shortly provide you with maps indicating the proposed routes for the tracks. We will also begin acquiring some of the necessary equipment that can be sourced locally, and we will begin making additional preparations.
[/quote]


[b]OOC Note:[/b] For the projects that have classified components, the classified parts would not be public (i.e. only the Vaulian govt know about them)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...