Cyber Nations Forums: Vaule subway overhaul/Operation Stalin's-Moscow - Cyber Nations Forums

Jump to content


Page 1 of 1
  • You cannot start a new topic
  • This topic is locked

Vaule subway overhaul/Operation Stalin's-Moscow Rate Topic: -----

#1 User is offline   Imperator Azenquor 

  • Advanced Member
  • PipPipPip
  • Group: Members
  • Posts: 1,508
  • Joined: 12-November 07
  • Nation Name:Vaule
  • Alliance Name:The Aquatic Brotherhood (TAB)

Posted 28 January 2009 - 08:16 PM

Vaule subway overhaul/Operation Stalin-Moscow

The Vaulian Ministry of Transport has announced the beginning of a vast overhaul of the capital city’s subway system. The $3.2 billion dollar project involves more than 370,000 workers from all over Vaule who will begin work in the capital as early as tomorrow morning. The project will expand the existing tunnel infrastructure to deal with additional traffic, as well as to open new subway lines and repair existing infrastructure.

The government has estimated that the timeline for completion of the project is set at nine months and workers will be working in two main shifts.

Posted Image
-Yellow (Existing subway network), Red (New construction routes)

***Extremely classified, not even the Parliament or the Army are aware of this***

Posted Image
-Blue lines( Secret tunnels for military use), Green boxes (Bomb shelters), Orange box (Classified underground military facility), Sky Blue (Vaule Presidential palace)

Classified: 21,000 low risk prisoners have been drafted by the SWoRD unit to be used in the construction process. The construction of the underground military facility will be done by SWoRD once the tunnels have been completed. The prisoners will work 13 hour shifts until the project is completed.

This post has been edited by Imperator Azenquor: 28 January 2009 - 09:22 PM


#2 User is offline   Imperator Azenquor 

  • Advanced Member
  • PipPipPip
  • Group: Members
  • Posts: 1,508
  • Joined: 12-November 07
  • Nation Name:Vaule
  • Alliance Name:The Aquatic Brotherhood (TAB)

Posted 29 January 2009 - 09:41 PM

Work on the project begins. Regular workers are assigned to work in 8 hour shifts (i.e. the workers are divided into two groups and each group works an 8 hour shift per day).

***Classified***

The low risk prisoners, under guard have been moved into position. They will work in 11 hour shifts until the project is completed, and they will not be paid for their participation. The government has however promised to lessen their original sentences so that they will depart jail earlier than originally planned.

#3 User is offline   ottawa1234 

  • Bohovia's Alternate Flag
  • PipPipPip
  • View blog
  • Group: Members
  • Posts: 676
  • Joined: 03-June 08
  • Nation Name:The Dominion of Bohovia
  • Alliance Name:Independent Republic of Orange Nations (IRON)

Posted 29 January 2009 - 09:51 PM

The Dominion of Bohovia, is very pleased to see, that Vaule is spending a substantial amount of money, to convience there citizens in there daily travels.

#4 User is offline   mykep 

  • Banned - No matching nation
  • PipPipPip
  • View blog
  • Group: Banned
  • Posts: 4,896
  • Joined: 05-September 07
  • Nation Name:Forever Battlefield
  • Alliance Name:Nemesis

Posted 30 January 2009 - 07:36 AM

We are pleased to see Vaule doing well. We ask, will these lines be connected to the RUSSIAN lines drawn up in my design?

#5 User is offline   Imperator Azenquor 

  • Advanced Member
  • PipPipPip
  • Group: Members
  • Posts: 1,508
  • Joined: 12-November 07
  • Nation Name:Vaule
  • Alliance Name:The Aquatic Brotherhood (TAB)

Posted 31 January 2009 - 01:37 PM

View Postmykep, on Jan 30 2009, 08:36 AM, said:

We are pleased to see Vaule doing well. We ask, will these lines be connected to the RUSSIAN lines drawn up in my design?


The current subway system will not be connected to the RUSSIAN rail network, as it's primary purpose is to serve the Sygh-Varthys capital territory and the north west of Vaule.

#6 User is offline   Imperator Azenquor 

  • Advanced Member
  • PipPipPip
  • Group: Members
  • Posts: 1,508
  • Joined: 12-November 07
  • Nation Name:Vaule
  • Alliance Name:The Aquatic Brotherhood (TAB)

Posted 02 February 2009 - 11:03 PM

...Repairs to tunnel A3 have been completed.
Other construction is still on-going...

The estimated completion time has been revised to 8 months.

This post has been edited by Imperator Azenquor: 02 February 2009 - 11:03 PM


Page 1 of 1
  • You cannot start a new topic
  • This topic is locked

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users